| Edinburgh Quay:
Phase 2, Offices Lochrin Basin development: Michael Laird Architects, Edinburgh Miller Developments + British Waterways Joint Venture |
| Quay2 : Edinburgh Quay Phase Two |
|
Michael Laird Architects Edinburgh Quay 2 - Fountainbridge, Edinburgh New photos by Paul Zanre of completed Quay2 building 101007:
![]()
![]() New images by Paul Zanre of completed Edinburgh Quay 2 building 070207:
![]() Edinburgh Quay 2 : Michael Laird Architects More Paul Zanre photos, unlinked for now - online soon:
![]() Recent projects by Michael Laird Architects: Haymarket Edinburgh - Submission images by pixelimage Edinburgh Park Southern Phase - Competition ![]() Site Photos, Dec 2006: Detail view from north, northwest, south:
images from Michael Laird Architects Interior views:
photos from Michael Laird Architects View from west, roof detail, south:
![]() exterior images from Michael Laird Architects proposed foyer: ![]() image from Michael Laird Architects Site Photo showing glass envelope with coloured panels, Sep 2006: ![]() exterior image from Michael Laird Architects Site Photos Sep 2006:
![]() exterior photos © Adrian Welch Edinburgh Quay Phase Two - Building PR The second phase of Edinburgh Quay will complete the development by constructing the A1 and A6 buildings which face the main Fountainbridge and western boundaries respectively. interior image from Michael Laird Architects Edinburgh Quay Phase Two comprises 75,000 sq.ft of mainly office accommodation arranged over six floors from Basement (-1) up to Fourth floor, to be constructed on top of the concrete podium which was built as part of the first phase. The structural frame will be primarily of concrete, with external finishes of aluminium curtain walling, rainscreen cladding, precast concrete panel cladding and blockwork with acrylic render finish. image from Michael Laird Architects Edinburgh Quay has already acted as a catalyst for the regeneration of Fountainbridge, with projects linking the city centre to the canal and residential areas beyond. Permission is being amended with start on site programmed for Autumn 2005. ![]() exterior image Dec 2006 from Michael Laird Architects Edinburgh Quay is a £60m mixed use development at the eastern terminus of restored Union Canal. Phase One received planning permission in 2001 and completed Spring 2005. ![]() exterior image Dec 2006 from Michael Laird Architects Edinburgh Quay Phase Two build cost is approximately £9m. The Union Canal dates from 1822 and originally terminated in Port Hopetoun [canal basin on Lothian Road]. Lochrin Basin was created in the early 20th century as the end section was infilled and the canal declined. Prior to redevelopment the Edinburgh Quay site was occupied by a series of poor quality buildings and industrial units; the Lochrin Basin was derelict and the towpath inaccessible to the public. exterior image from Michael Laird Architects The Joint Venture between British Waterways and Miller Developments is entitled Edinburgh Quay Ltd. The Miller Group is the UK's largest privately owned property company. ![]() exterior image Dec 2006 from Michael Laird Architects Materials used at Edinburgh Quay Phase Two include a structural frame of concrete and steel (for the top floor only) with external finishes of aluminium curtain walling, rainscreen cladding, precast concrete panel cladding and blockwork with acrylic render finish. Roof areas will be a combination of lightweight decks with single layer pvc membranes for the top most roofs and concrete decks with asphalt for roof plant areas and roof terraces. Site Photo Sep 2006, Phase Two on left: ![]() exterior photos © Adrian Welch Edinburgh Quay Two - Aerial Photo showing the site: ![]() aerial image from Michael Laird Architects Also by Michael Laird Architects: Housing: Leamington Wharf, Fountainbridge, Edinburgh ![]() Leamington Wharf Housing: Union Canal image from Michael Laird Architects Leamington Wharf housing is located on the Union Canal, west of Edinburgh Quay Offices: Fountainbridge image from Michael Laird Architects Lochrin Square Housing: Lochrin Basin Lochrin Place Housing: Lochrin Basin EQ2 Apartments, Lochrin Basin Edinburgh Buildings : back to index To the north and west are Fountain Park, Fountain North and the City Travel Inn Edinburgh Quay Phase Two: received full planning Sep 2005 Edinburgh Quay - original buildings + masterplan |